Articles

What Sets a Good Party Wall Surveyor Apart

What sets a good party wall surveyor apart is their ability to protect both properties and keep the project moving—without inflaming tensions or running up unnecessary costs. Here are the key differences you’ll notice with the better surveyors.

Clear, confident command of the Party Wall Act

A strong surveyor can quickly and accurately:

  • confirm whether the Act applies (and which parts),
  • identify the correct notice type(s) and who must receive them (owners, freeholders, leaseholders),
  • manage timelines properly so you don’t lose weeks to avoidable mistakes.

They don’t guess, and they don’t overcomplicate.

Real building knowledge, not just paperwork

The best party wall surveyors understand construction well enough to spot risk early and write practical safeguards. They can read drawings, understand sequencing, and anticipate issues like:

  • beams into party walls,
  • chimney removals,
  • excavation and foundation depth risk,
  • weatherproofing and temporary support.

That technical judgement is what turns an Award into something useful on site.

A thorough Schedule of Condition

Top surveyors treat the Schedule of Condition as essential protection—not a quick tick-box visit. They:

  • inspect carefully (not rushed),
  • document existing cracks/defects clearly,
  • include good photos and clear room references,
  • produce a record that prevents arguments later.

This one document often determines whether a “damage claim” becomes a non-issue or a headache.

An Award that’s tailored and practical

A good Award is clear, site-friendly, and specific to the job. It sets out:

  • what’s permitted and what isn’t,
  • working hours and access arrangements,
  • protection measures (dust, vibration, weathering),
  • how damage is assessed and put right,
  • when inspections happen and what triggers extra visits.

Poor surveyors rely on generic templates that don’t reflect the actual works.

Calm, professional neighbour management

Great surveyors reduce conflict. They communicate in a way that:

  • reassures worried neighbours,
  • keeps correspondence polite and factual,
  • prevents issues escalating,
  • avoids “point-scoring” that creates delay and cost.

This is a major reason some projects run smoothly while others drag on.

Transparent, proportionate fees

The better surveyors are upfront about:

  • fixed vs hourly charging,
  • what’s included (notices, inspections, schedule, Award, post-check),
  • what triggers extras,
  • and how they keep fees reasonable.

They’re happy to provide itemised costs and won’t hide behind vague wording.

Efficient process management

They keep things moving by:

  • serving correct notices first time,
  • chasing responses professionally,
  • arranging inspections quickly,
  • producing drafts promptly,
  • avoiding unnecessary back-and-forth.

Efficiency isn’t rushing—it’s having a clean process.

Independence and credibility

A party wall surveyor must act impartially under the Act. The best ones:

  • don’t “take sides,”
  • don’t promise unrealistic outcomes,
  • make decisions that are defensible and reasonable,
  • produce Awards that stand up if challenged.

Quick litmus test

If they can explain your situation in plain English, give a clear scope and fee structure, and show evidence of thorough schedules/realistic Awards—those are good signs.

If you want, paste in a quote (or tell me your project type: extension/loft/basement and terrace/semi/flat) and I’ll point out what to look for and what’s missing.

Want help with your Party Wall Matter?

Email mail@howorth.uk with your property address, a short description of the works, your intended start date, and any drawings/plans you have. We can help confirm whether notice is required and guide you through the next steps.